Back to top
Menu
tabs

CISCO 2027 Event Services Rate Cards

 

Conference MAINS SERVICES 2027

Advance Rate: Enjoy our best value by booking 14 days or more before the tenancy start date.
Standard Rate: Available for bookings made between 13 and 8 days before the tenancy start date.
Late Rate: For last-minute bookings made 7 days or fewer before the tenancy start date - we'll confirm availability right away.

Please note: Orders are confirmed once availability is secured and full payment is received, ensuring prompt processing and delivery.
This rate card applies only to the appointed electrical contractor; the rates within do not include termination, testing, distribution, or fittings.
Mains orders will only be accepted from electrical contractors pre-approved by Excel London, with evidence of complying with BS7671. See the eGuide here for specific clarification.
Excel London can recommend approved electrical contractors if required.
Please contact power@excel.london for more information.

 

STANDARD MAINS - SINGLE PHASE 230 VOLT

Service Option Advanced Standard Late
6 amp single phase 230 volt £187 £225 £270
10 amp single phase 230 volt £286 £343 £412
16 amp single phase 230 volt £361 £433 £519
20 amp single phase 230 volt £386 £464 £556
32 amp single phase 230 volt £633 £759 £911
40 amp single phase 230 volt £746 £895 £1,074
50 amp single phase 230 volt £966 £1,159 £1,391
63 amp single phase 230 volt £1,070 £1,285 £1,541

STANDARD MAINS - THREE PHASE 400 VOLT

Service Option Advanced Standard Late
10 amp three phase 400 volt £560 £671 £806
16 amp three phase 400 volt £761 £914 £1,096
20 amp three phase 400 volt £956 £1,147 £1,377
32 amp three phase 400 volt £1,288 £1,546 £1,855
40 amp three phase 400 volt £1,375 £1,650 £1,980
50 amp three phase 400 volt £1,717 £2,061 £2,473
63 amp three phase 400 volt £2,031 £2,437 £2,924
125 amp three phase 400 volt £3,579 £4,295 £5,154
200 amp three phase 400 volt £5,049 £6,059 £7,271
315 amp three phase 400 volt £7,393 £8,872 £10,646
400 amp three phase 400 volt £8,476 £10,172 £12,206

24 HOUR MAINS - SINGLE PHASE 230 VOLT

Service Option Advanced Standard Late
6 amp single phase 230 volt £202 £242 £290
10 amp single phase 230 volt £324 £388 £466
16 amp single phase 230 volt £454 £545 £654
20 amp single phase 230 volt £569 £682 £819
32 amp single phase 230 volt £717 £860 £1,032
40 amp single phase 230 volt £798 £957 £1,149
50 amp single phase 230 volt £1,058 £1,269 £1,523
63 amp single phase 230 volt £1,226 £1,471 £1,765

24 HOUR MAINS - THREE PHASE 400 VOLT

Service Option Advanced Standard Late
10 amp three phase 400 volt £645 £774 £928
16 amp three phase 400 volt £874 £1,048 £1,258
20 amp three phase 400 volt £998 £1,198 £1,437
32 amp three phase 400 volt £1,456 £1,747 £2,097
40 amp three phase 400 volt £1,514 £1,817 £2,181
50 amp three phase 400 volt £1,894 £2,273 £2,727
63 amp three phase 400 volt £2,265 £2,718 £3,261
125 amp three phase 400 volt £4,118 £4,491 £5,930
200 amp three phase 400 volt £5,810 £6,972 £8,367
315 amp three phase 400 volt £7,968 £9,562 £11,474
400 amp three phase 400 volt £9,438 £11,325 £13,591

TEMPORARY MAINS

Standard mains only, 24hr not available.

Service Option Advanced Standard Late
Cable pull (per cable) £349 £419 £503
Illuminated Exit Sign £322 £387 £464
13 amp temporary socket £397 £476 £572
10 amp single phase 230 volt £397 £476 £572
16 amp single phase 230 volt £397 £476 £572
32 amp single phase 230 volt £431 £517 £620
63 amp single phase 230 volt £737 £884 £1,061
10 amp three phase 400 volt £422 £506 £607
16 amp three phase 400 volt £518 £621 £745
32 amp three phase 400 volt £881 £1,057 £1,269
63 amp three phase 400 volt £1,181 £1,417 £1,701
 

SPECIFICATION

It is in your interest to read this document thoroughly as this will help to avoid confusion at a later date.

The rate card cost of each main includes the installation and removal of the mains cable, and the electrical consumption only. The standard and 24hr mains are available during the event live period only; temporary power for build-up or break-down is not included. Temporary mains power required during build-up or break-down must be ordered separately, in addition to your standard or 24hr mains order.

1. All mains orders must be submitted with a floorplan, marked clearly with the location of each mains supply requested, we are unable to install your mains without this.

2. Electrical mains will be supplied via the service duct, as designated on the master floor plan by the event electrical contractor.

3. Discretion on mains location will be made for all mains where the electrical contractor has not designated a service duct.

4. Relocating a mains from east to west in Phase 1 & 2 is free of charge up to 3 traps. For Maritime Halls, this will be from north to south.

5. Relocating a mains from north to south in Phase 1 & 2, or more than 3 traps east to west, will be treated as a cancellation (50% charge) and reordered at its original rate. For Maritime Halls, this will be east to west, or more than 3 traps north to south.

6. All power will be supplied in a terminated fused isolator. The box size is approximately 27cm x 37cm x 20cm. The mains cable to the fused isolator box will normally have a round profile cable of 32mm.

7. The fused isolator box must be accessible at all times. The location of the fused isolator should be designed on the stand plans. All cable exits and their associated isolators from the mains service duct need to be factored into the overall floor and stand plans. These must be contained within a stand or feature footprint. They will not be permitted in any gangway or public area.

8. Flat profile cables are limited in availability and will only be supplied at the discretion of the Excel mains team. Any flat profile cable under a carpet will need capping, to be supplied and installed by the appointed electrical contractor. Excel London will not permit mains cables (flat or round) to be installed in gangways or aisles.

9. All mains over a 125 amp 3 phase are supplied on power locks.

10. The RCD on the main switch is set to 300MA.

11. 13 amp sockets are only provided for temporary mains orders, for use during the build-up and break-down period only. 13 amp temporary sockets are not permitted, nor powered during the event live period.

12. All mains ordered for the live period of the event will be de-energised after testing is complete and will be re-energised on the last day of build. Temporary mains supplies must be ordered separately to the mains ordered for the event live period if power is required during build or break. Temporary mains will be energised during the tenancy hours of build and break only.

13. During the open period, standard mains will be switched on and off daily, 30 minutes before and after the published event open and closed times, unless 24-hour power has been requested. Lighting will not be allowed to operate on a 24-hour main supply.

14. 24-hour mains supplies will be switched on 30 minutes before the start of an event and off at the close of the last day of the event live period.

A fuse replacement surcharge cost of £9 (ex-VAT) will be charged per fuse. This will be charged post event.

All distribution from the supplied main, at the mains service duct location, to its electrical appliance, is the responsibility of the appointed electrical contractor or their client.

SUMMARY OF TERMS & CANCELLATION POLICY

Please note that you are liable for a full recharge of the main ordered if the location submitted is incorrect, with exception to point 4 in our specifications.

Power distribution is not included, nor provided by, Excel Event Services.

No temporary mains services can be cancelled once an event has started build.

The use of batteries to provide mains stand power is strictly prohibited, as batteries are not currently considered to be a safe source of power.

Termination, testing and distribution of power is not included, nor provided by Excel Event Services, it is the responsibility of the appointed electrical contractor.

Excel London reserves the right to adjust pricing for any service during the year. Subject to payment being received by Excel London in respect of the service within 28 days of the date of the order confirmation, the price quoted on the order confirmation for that service will be honoured.

If the Excel Event Services team are notified of the order cancellation by the appointed electrical contractor:

• 14 days or more prior to the first day of the event tenancy*, a refund or credit of 100% of the order value is offered.
• Within 13 days prior to the first day of the event tenancy*, a refund or credit of 50% of the order value is offered.

A down-rated mains charge will be applied post event, for all mains which are down-rated after the initial order. This is 50% of the difference between the two prices.

*If you are uncertain as to the first day of tenancy of the event please contact power@excel.london.

To discuss any requirements, please email our team at power@excel.london. The office is open from Monday to Friday 09:30–17:00hrs.

close back
Your search for "..."
did not yield any results.
... results for "..."
Search Tags